
mobile : +971 50 543 88 60
mobile : +971 50 777 60 22
email :majed.azzam@gmail.com
email :m5438860@yahoo.com
Majed Azzam
Senior Electrical Engineer
Head Of Design Department

- Design
- Re-Design
- Design Review
Leading the design team.
Coordinate with the clients.
Apply Authorities Regulations.
Preparing tender documents.
Leading supervision team.
Coordinate with other design dep.
Oud Metha 8 Towers - Dubai
CURRENT ACCOUNTABILITIES
COORDINATION
a. Coordinate with the engineering team during the detailed design stage of the project to ensure design compliance.
MEETING
b.Attend executive meetings, weekly progress meetings, quality, safety meetings, and weekly technical meetings.
TEAM LEADING
c. Carry out documented inductions to ensure Staff’s awareness of the project requirements.
d. Coordinate and review staff performance and ensure compliance with jobs requirements.
TENDER DOCUMENTS
d. Monitor and control MEP activities, assure that the work is carried out in complete accordance with the Approved Drawings & Material, Specifications

JVC Tower - Dubai
DRAWINGS REVIEW
f. Review the following drawing and ensure compliance with
specification, authorities regulations, and construction drawing
- Builders Works Drawing
- Shop Drawing for each system.
- Single Line Diagram & Schematic Diagram.
- Load Schedules.
- MEP Coordination Drawing.
- MEP / ID Coordination Drawing.
- Service & Plant Rooms Drawing.
- As-Built Drawing.

AM Tower - Dubai
SUBMITTAL REVIEW
g. Review the following submittals and ensure compliance with specifications and authorities regulations.
- Material Submittals (MAR) & Sample Tag (ST).
- Method of Statement.
- Operation Manual (O&M).
- Assets Registry.
SITE DOCUMENTS REVIEW
h. Review the following documents and ensure compliance with approved shop drawing, specification, and authorities regulations.
-Inspection Request Form (IRF).
-Inspection Request For Commissioning (IRC).
- Completion Inspection Request Form (CIRF).
i. Review and assessing variation claimed by the contractor.
j. Review Request for Information(RFI) to provide the contractor with proper information.

Medical Center - Dubai

ECONOMIC Department - Dubai
SITE DOCUMENTS ISSUING
k. Issue the following Documents:
- Engineer's Instruction ( EI ).
- Site Work Instruction ( SWI ).
- Non-Conformance Report (NCR)
l. Follow up pending issues with authorities.
SITE CONSTRUCTION AUDITING
m. Audit installations during construction, witness Factory, and
Site Acceptance Tests, pre-commissioning, and commissioning of
equipment/systems, and assure that the installation/performance
is in accordance with specifications.

JEBEL ALI TOWERS - Dubai
ANALYSIS CONSTRUCTION PROGRESS
n. Advise the Employer of any foreseen slippage of progress and propose corrective actions.
o. Review progress plan and ensure the deliverable works are executed in a timely manner and as per project progress milestones.
p. Monitor if there is any deviation from the project requirements, report to the Client on time, and address any possible time or cost impact associated with it.
q. Coordinating with the client, project management, and contractors for final site work acceptance.

MAIN KITCHEN - Dubai

AJMAN FREE ZONE 82 WAREHOUSES
SUPERVISION ACCOUNTABILITIES
COORDINATION DURING DESIGN STAGE
a. Coordinate with the engineering team during the detailed design stage of the project to ensure design compliance
MEETINGS
b. Attend executive meetings, weekly progress meetings, quality, safety meetings, and weekly technical meetings.
TEAM LEADING
c. Carry out documented inductions to ensure Staff’s awareness of the project requirements.
d. Coordinate and review staff performance and ensure compliance with jobs requirements.

RITZ CARLTON - ABU DHABI
ACTIVITIES CONTROL
d. Monitor and control MEP activities, assure that the work is carried out in complete accordance with the Approved Drawings & Material, Specifications
DRAWINGS REVIEW
f. Review the following drawing and ensure compliance with specification, authorities regulations, and construction drawing
- Builders Works Drawing
- Shop Drawing for each system.
- Single Line Diagram & Schematic Diagram.
- Load Schedules s.
- MEP Coordination Drawing.
- MEP / ID Coordination Drawing.
- Service & Plant Rooms Drawing.
- As-Built Drawing.
DOCUMENTS REVIEW
g. Review the following submittals and ensure compliance with specification and authorities regulations.
- Material Submittals (MAR) & Sample Tag (ST).
- Method of Statement.
- Operation Manual (O&M).
- Assets Registry.

DISCOVERY GARDEN - Dubai
